First thing.. We hope you have enjoyed a nice time over the end of the year break and with your families and friends during Christmas.
We were lucky to finally do a lifetime-delayed travel to Europe, it was really nice time [and freaking cold too :-) ], it was almost a month so we came back with a lot of expectations about what would be the construction progress... Well it wasn't bad at all... tiles have been installed through all the wet areas (main bathroom, en-suite, powder room, laundry and porch). There were also some work done to open cavities in the gyprock for electrical and a/c installations. Additionally, the ground floor bricks have been cleaned up and the balcony cladding is finished. Here some pics:
 |
Ensuite shower |
 |
Ensuite cabinets |
 |
Ensuite cavity for SPA |
 |
Balcony Cladding |
 |
Main Bathroom |
 |
Ground floor from living room |
 |
Laundry |
 |
Powder Room |
 |
Cleaned bricks |