Today the fence was installed, according to WH the excavation work supposed to be done at the end of this week.. so they have one more day to do it. We will go back during the weekend to check if there some other change. Happy so far to see that finally, all the steps we saw in so many blogs are happening for us.
Thursday, 3 July 2014
Now we have a fence
Tuesday, 1 July 2014
Finally... the most awaited Portaloo ever
Last Friday we received an email from WH letting us know that something would happen this week in our lot. Today we received another email saying that the initial excavation works will be done during this week.. Finally some action will start happening in our lot :-)
So, coming back from work we decided to pay a visit to our lot, and we found the so awaited portaloo...
We had idea that something may be happening so we've packed the tripod with us, so we were able to take some snaps playing around with the camera's exposure. Here some of the best ones
Oh.. and we definitely weren't expecting this, we found a fox in Coach Drive, it was eating something, no sure what.. but seems something that was alive some minutes before... I hope when people moves in it goes away.. I don't think I'll feel comfortable walking alone.. hahaha
Location:
Voyager Point NSW, Australia
Wednesday, 11 June 2014
Bank Approval
We have suffered a lot to get to this point!
All I can say is that I hate BW bank, I hope to move to another Bank as soon as possible.
Anyways, after weeks of anguish we finally got the letter :)
Now we are happy and we will try to keep it positive.
We are waiting for the Final End Panel (we signed the draft on 27/5/2014) so it's been 11 working days of waiting. According to our CSO this could be up to 15 working days...So we are not so far away.
Happy days ahead :)
All I can say is that I hate BW bank, I hope to move to another Bank as soon as possible.
Anyways, after weeks of anguish we finally got the letter :)
Now we are happy and we will try to keep it positive.
We are waiting for the Final End Panel (we signed the draft on 27/5/2014) so it's been 11 working days of waiting. According to our CSO this could be up to 15 working days...So we are not so far away.
Happy days ahead :)
Sunday, 25 May 2014
What is that??
Saturday night, we had our weekly visit to the block.
We saw 4 of these objects... Does anybody know what they are??
We saw 4 of these objects... Does anybody know what they are??
Saturday, 17 May 2014
CDC and work in advance :-)
Hi everyone, the news of this week was that we finally got our plans approved by CDC, together with the approval, WH sent us all the documentation required to get the Construction Loan Application (stamped plans, builder insurance, builder licenses, among others). So, last Friday we sent everything to our mortgage broker, now we move again to wait status. In the meantime we are trying to do some work in advance like growing our hedgings :-) hahaha. Well we have at least 8 months before move so we opted to buy small hedges and start looking how they develop. If it is too slow we will buy more grown ones. We bought these in Masters, they were $2 each (approx), we are planning to have edgings in the path towards the entry of the house and maybe around the house to delimit the boundaries.
In March we bought a lime dwarf tree, which for now is in a pot, we expect it to be in one corner in our backyard.
Those are all the news we have for now. Our neighbours have already locked out their home and their neighbour has already his slab drying. There is also lot of things going on in Heartwood, some of the DHA houses look already finished and some of them are getting their driveway and fences done. If everything is still the same with our process we may start when someone is already living there :-)
Sunday, 27 April 2014
Electrical Appointment
More than one month ago we had our Electrical appointment. To be more precise, it was on the 19th March. That was a really long day. Having first our Aircon appointment at 9:30, then DiLorenzo (for tiles and carpet) at 11am and finally Clipsal at 2pm.A little context:
Well before we requested the tender, we started drawing our first electrical layout. We had a clear idea of what we want for our house. We are not really fussy about electricals, but we wanted to have at least the basics so we can install later the rest. Some decisions we made after give it a lot of thinking were:
- We are not installing any LED for now. We will request only provision and install LEDs, pendant lights, and others after handover.
- We are not going to make any special installation for the Home Theatre, we will rather put a big TV instead of a projector.
- We will put the minimum number of data points, we decided to trust that WI-FI will improve even more in the in the coming years. However, at the end during the meeting, the consultant mentioned that we can return the included phone points and use that credit for Data points instead. We were happy to change them. So at the end we ended up with 5 data points.
When we arrived to Clipsal, we met with our consultant Leah, she is such a nice girl!!
We sat for 1.5 hours with her, I can't imagine going to this appointment under-prepared, specially if you are not a sparky nor want to spend more money once you are in your new place. Even with all of this, we missed one light! luckily it wasn't an important one ( it was a light for a future artwork)
There was a clear difference with all other WH's providers in comparison with Clipsal. Previous to our appointment they called us to confirm the meeting time and give some details on how to arrive to their office. Then a couple of days after that we received (by mail) an envelope containing a booklet with all the products that Clipsal provides for homes, a complete price list and some maps and instructions on how to reach Clipsal and where to find the customer's parking. Additionally there was a copy of our home layout so we can start playing around with the distribution of lights, power points and others. They really do their homework.
I think that with the WH inclusions you will have a lot, but in the modern lazy world you are going to want more!!.
We basically added:
1. A extra power point to all the rooms.
2. Provision for LED to all the living areas.
3. Change 2 power points to Saturn Horizon Silver (In the splashback in the Kitchen)
4. 5 Data point(only included one).
5. We deleted 2 telephone points and got the credit, so we added more data points.
6. 8 Extra external lights. We have, as we called it, backyard and side yard.
7. 4 Square footer light for our staircase.
8. 2 Extra TV points (included 2)
At the end we exceeded our allowance. The total was $ 3717. This could have been less, at least for $ 210 (price of the 2 Saturn power points). But we are happy with that.
During the meeting we decided to change the orientation of our living room, thanks to Leah who made us realised our mistake. She was really good in pointing out improvements in location of lights and switches, safety and recommendations about the layout in general. However, you have to go prepared with clear ideas in mind about what do you want.
We left Clipsal extremely tired, but happy to finish with all the meetings (before the wrap up meeting). It was a very intense day.
Now, we need to start budgeting the inclusions we are planning to do after moving in. These are mainly LEDs, pendant lights, external lights and any other stuff we will need for replacing the basic bayonets/provisions that we requested in our electrical appointment. Ah.. and the most important a sparky to help us with the installations.
See you next time :)
Saturday, 26 April 2014
Update of the proposed dwelling
There was an update on our plans a couple of months ago. After our BAL was reduced to 19 (from 40) we got the chance to apply through CDC, so our plans were changed accordingly.
That was very positive for us, after these changes we realised a mistake done by WH. At the beginning of the process WH reduced the length of our house by 30cm to comply with the APZ in the front of the house (that was really frustrating for us), however it wasn't necessary. After the changes done to apply to CDC, we realised they have added eaves to the balcony... I guess it was a bad copy paste..
Anyway, that was modified and now our house has the same dimensions than the brochure.
Subscribe to:
Posts (Atom)



