Hi, as you may already guess, We have already moved to our new house, we haven't been updating the blog as it has been a really busy period of time. No only because the house, and the almost 5 times we needed to call the air conditioner guys, 4 times the garage door company, and 3 times the plumber to fix the same issue; but because the last family member has arrived.. and he is...an earthquake...
Our House in Voyager Point
Our journey building our house in Voyager Point, Sydney, NSW
Tuesday 19 May 2015
Sunday 29 March 2015
Fence is gone and driveway is ready
Hi guys, seems like the building is finally coming to a end. No sure we will miss the 4 times a week trip to check what was new in the house. However, there are still plenty of things yet to start, but the main thing, the house is almost finished. Two weeks ago was our PCI, we thought it was just a informal walkthrough until a day before when WH sent us an email saying that our PCI was in the following days :-).
The PCI was around 3 hours, we brought to the meeting a list of observations that we compiled over our last visits, most of the items were still valid. Then we went through the house checking imperfections in painting, mortar in general, scratched windows and small details mostly. The meeting was at 7am and the SS was there before us, so he had already put some blue tape in several things to fix.
After the meeting the SS told us that he was able to accommodate all fixes and pending things in the next two weeks, so we can have the house ready before Easter. We were a little bit sceptic about the date, but after one week, it seems we may be able to get all things done.
The biggest issue highlighted in the PCI was that the kitchen bench (or the tiles under it) were a little bit misaligned. We were told that it may be possible to play around with them to hide the misalignment. It is not a big issue, I didn't even notice, but my wife found it.. and as the SS told us, once you saw that kind of thing, it will bother you forever.
Pending for this week are: fix this misalignment I mentioned, finishing the water tank installation, driveway sealing, carpet installation, replace damaged windows, mortar fixing, painting fixing and some gyprock repairs, main door painting. It sounds a lot now that I'm writing down the list, but we trust we will make it. The settlement day is scheduled for this Thursday. Let see how things unfold...
Some photos from the last week:
The inspection certificate of our driveway.
The driveway was poured on Wednesday.
Yesterday, we went again to the house and we found that the fence is gone.. also the preparation works for the landscape were done. We are planning to to the landscape ourselves, so yesterday was the first time we can appreciate the magnitude of the work that is coming for us... :-)
Some dirt is still to be removed.
Now, the house feels a little bit .. how to say it... naked.. haha.. Anyway we will have the blinds installed this week, and the side fence is scheduled for the week after, so we can have a little bit or privacy.
Thursday 5 March 2015
Tiling almost finished...
Tilling is almost finished, a/c vents and splash-back have been installed. How do you think the house is looking?
Monday 23 February 2015
Some internals
Hi all, here some pictures of today's visit:
Our ground floors tiles are in the garage ready to be laid.
The garage door mechanism... it seems to be small for the door :-)
Cabinets in the main bedroom
Main bathroom
Tab of the bathtub in the main bathroom, no happy with it, it is too short and water falls outside the bathtub.
The towel rail was placed in an incorrect place, we requested explicitly to be placed close to the spa, as we were planning to put something else in that place. I wonder if houses would be less expensive if builders do less errors. Now in order to move it, they will need to remove the shower glass, remove the mirror and replace 3 tiles.
Dinning room, with lights :-)
Tuesday 17 February 2015
Small bits and pieces...
We are waiting for the tiling to start, but in the meantime some bit and pieces have been happening. Yesterday the bathtub, toilets, spa and door handles were delivered. We also realised that the shelves in the pantry were already installed.. no sure when though. Today we found that the Garage door was installed, it was really quick. We were discussing why we didn't have the Wisdom Ad in our house and today it was finally place in the fence... haha it is funny as we are really close to completion.. (well at least it seems like it). Enjoy the photos.
Saturday 14 February 2015
Façade is almost finished
Sorry for the car photobombing.. but I liked this picture, the sky was just so full of colours... The façade is almost finished and now we can see the colours in real life. We think now that the combination was a little bit risky, but I think the final product is looking good, now we need to think about the colour of the fence, so it matches the same palette. Our garage door will be surfmist, close to the colour of the fence with our neighbours and to the first floor cladding. The balcony is missing the rail bars yet and also a privacy screen in the right side, which was required by CDC.
For the fence we are thinking in using modular walls system but we are still trying to decide if we should go all around the corner until the driveway (1.8m decreasing to 1.2m high in the corner and front) or whether we should just put some retaining walls with some shrubs (like a raised garden bed) for the delimiting the land.
We have been growing some Lilly Pilly Acmena var minor (28 of them) in the balcony of the place we are living now, and we have also some English Box (around 60).
Our idea is to use the English boxes to create a path towards the door and put the Lilly Pillies behind the modular wall (in case we decide to go all round the corner), or put them in top of the raised bed garden (if we decide to go for that).. decisions... decisions... :-)
Wednesday 11 February 2015
Getting closer.. slow but closer
Some photos of the progress done during the last weeks. The house is taking shape and finally we feel close to the end. Last week I've received a call from the Site Supervisor saying that he was leaving WH and that he will hand over to another person. We will have a meeting with him tomorrow morning, we hope we can get an approx. date of completion. Our previous supervisor told us some months ago that the house will be finished on February, however we see that very unlikely. We hope we still on time to finish in March, we'll update you as soon as we know. The house is looking beautiful, we are really happy with the options we took, with exception of small details such the mirror in the ensuite.. when we realised that having only one mirror was an upgrade, it was already late to do any change. Anyways, enjoy the photos :-)
Subscribe to:
Posts (Atom)